Dorm Damage Inspections Workorder
Problem Description :
How to process the dorm damages
Resolution :
Housing Move out Procedures
Plant will do inspections 2 weeks prior to the week of move out
Computer Services will print out Admin Checkout Checklist – All Dorm Students
Hiding the key checkout section in crystal
After inspections are complete Plant will enter the dorm damages for each student into the Dorm Inspection system
Once the damages have been entered they will notify Computer Services to apply the charges to the students accounts
Computer Services should let business office know before they post the charges
Computer Services will run the script to post charges
Located on vulture\batch\sqls\insert_tbraccd_damg.sql
Check the term in the script to make sure it is correct before running
Once charges are posted Comp. Serv. Will run the emails batch to notify students of their charges
The batch file is located on vulture\BossHousing\Emails\dorm_damgage.bat
Before running check the term in damage.sql
Once charges are posted and emails are sent Comp. Serv. will print Student Key and Condition Checkout- All Students report in crystal for housing to give to students to sign when they move out. The report includes a list of charges for their room.
Check forms to make sure the charges are on the report before printing
Revision Date : 5/11/2017